Safety Risk Assessment During the Construction Period of Onshore Wind Power Projects

Author(s): Qianhan Zhang1,2, Tao Ma1, Bingyan Wei1, Xiaoying Wu1,2
1Hebei Institute of Mechanical and Electrical Technology Xingtai City 054000, Hebei Province, China
2Intelligent Production Line and Equipment Technology Innovation Center of XingTai
Zhang, Qianhan . et al “Safety Risk Assessment During the Construction Period of Onshore Wind Power Projects.” Ingegneria Sismica Volume 43 Issue 2: 1-24, doi:10.65102/is2026831.

Abstract

In order to investigate the safety risk factors that exist in the construction phase of onshore wind power projects and their specific effects and impacts on the overall construction safety management system of wind power projects, this study uses the PDCA (covering planning, execution, inspection, and action) management concept as theoretical support, and integrates the Decision Testing and Evaluation Laboratory (DEMATEL) method and Analysis Network Process (ANP) technology to comprehensively evaluate the construction safety status of onshore wind power projects. In specific operations, relevant influencing factors are screened and determined from four key areas: potential risks in personal safety, risks in equipment safety, risks that may arise in environmental safety, and risks in managing safety processes. A scientific and reasonable evaluation index system is then constructed. Through the DEMATEL method, the comprehensive impact matrix between indicators is calculated, the indicator network structure is organized through the ANP method, and a qualitative evaluation of the risks is conducted. Empirical research has shown that the research method used in this article can effectively evaluate the safety conditions during the construction process of onshore wind power projects. This method has the ability to accurately identify key indicators that have a significant impact on construction process safety, providing valuable reference for relevant regulatory departments to make decisions and implement supervision.

Keywords
DEMATEL-ANP; Risk Evaluation; Wind Power Engineering

Related Articles

Qianwen Xiong1, Yuhong Chen1
1Guangzhou University of Chinese Medicine, School of Pharmaceutical Medicine, Guangzhou,Guangdong,China,510006
Zhihao Jiang1,2, Limi Chen1,2, Jing Yang1
1Hainan Vocational University of Science and Technology, Haikou 571126, China
2Institute for Mathematical Research, Universiti Putra Malaysia, Serdang 43400, Malaysia
Limi Chen1,2, Zhihao Jiang1,2, Jing Yang1
1Hainan Vocational University of Science and Technology, Haikou 571126, China
2Institute for Mathematical Research, Universiti Putra Malaysia, Serdang 43400, Malaysia
Hui Yuan1, Minjie Chai2, Siqing Xu1, Jinsong Li1, Jinwan Zheng1
1Electric Power Research Institute, State Grid Shanxi Electric Power Co., Ltd., Taiyuan, 030001, Shanxi, China
2Jincheng Power Supply Branch, State Grid Shanxi Electric Power Co., Ltd., Jincheng, 048000, Shanxi, China
Yanhan Zhu1,2
1China Academy of Cultural Heritage, Chaoyang District, 100029, Beijing, China
2Beijing University of Civil Engineering and Architecture, Xicheng District, 100044, Beijing, China