Outline

Ingegneria Sismica

Ingegneria Sismica

Adaptability and transformation enhancement strategy of substation three-dimensional design model operation and maintenance under digital transformation environment

Author(s): Youhui Chen1, Zhonghua Lü1, Qi Pan1, Xinying Zhao1
1State Grid Liaoning Electric Power Company Limited Economic Research Institute, Shenyang, Liaoning, 110015, China
Chen, Youhui . et al “Adaptability and transformation enhancement strategy of substation three-dimensional design model operation and maintenance under digital transformation environment.” Ingegneria Sismica Volume 43 Issue 1: 1-22, doi:10.65102/is2026058.

Abstract

The traditional substation operation and maintenance model is facing challenges such as data dispersion, response lag, and low 3D visualization. The 3D reality interaction system becomes the key to break the situation. By analyzing the standard model library, the study generates a point cloud uniformly and randomly in the triangular grid of basic elements, and then assembles it into a complete component model based on the transformation matrix. OPTICS clustering algorithm is used to segment the complex distribution of point clouds of buildings in the scene. And the integration of Web front-end technology, BIM modeling and operation and maintenance strategy optimization, to build a three-dimensional reality interactive system, to achieve equipment status visualization and inspection path planning. Under the harsh condition of point cloud thinning to 50%, the model coverage rate can still maintain 74.20%. The triangulated point cloud + OPTICS clustering in this paper significantly outperforms PCA+KNN and RANSAC+ICP with an average recognition time of 6.07 s and an accuracy of 96.73%, and the recognition accuracy shows stronger anti-interference ability under the interference of added noise and uneven density, with a noise variance of 0.08, which still reaches 55.68%. The average frame rate of 3D model rendering reaches 39.94 fps, running smoothly and stably. In actual operation and maintenance tasks, the system improves the efficiency of operations such as “running to cold standby” by 39% to 52%.

Keywords
3D reality interactive operation and maintenance; point cloud data; OPTICS; BIM modeling; substation

Related Articles

Zhihao Jiang1,2, Limi Chen1,2, Jing Yang1
1Hainan Vocational University of Science and Technology, Haikou 571126, China
2Institute for Mathematical Research, Universiti Putra Malaysia, Serdang 43400, Malaysia
Limi Chen1,2, Zhihao Jiang1,2, Jing Yang1
1Hainan Vocational University of Science and Technology, Haikou 571126, China
2Institute for Mathematical Research, Universiti Putra Malaysia, Serdang 43400, Malaysia
Hui Yuan1, Minjie Chai2, Siqing Xu1, Jinsong Li1, Jinwan Zheng1
1Electric Power Research Institute, State Grid Shanxi Electric Power Co., Ltd., Taiyuan, 030001, Shanxi, China
2Jincheng Power Supply Branch, State Grid Shanxi Electric Power Co., Ltd., Jincheng, 048000, Shanxi, China
Yanhan Zhu1,2
1China Academy of Cultural Heritage, Chaoyang District, 100029, Beijing, China
2Beijing University of Civil Engineering and Architecture, Xicheng District, 100044, Beijing, China
Ken Wang1, Jinhan Shu2, Kan Yuan1
1School of Digital Media, Shenzhen Polytechnic University, Shenzhen 518055, Guangdong, China
2Postdoctoral Mobile Station of Journalism and communication, Fudan University, Shanghai 200433, Shanghai, China